Phase VIII - Re-Assembly and Re-Opening

Completed:  Ongoing

previous.gif (384 bytes)
Phase VII



Columns arrive in New Philadelphia
for re-assembly
 


Columns arrive in New Philadelphia
for re-assembly


Bridge components arrive in New Philadelphia for re-assembly
 


Bridge components arrive at the
job site for re-assembly


Bridge re-assembly is underway


Bridge re-assembly is underway


Bridge re-assembly continues


Bridge re-assembly continues


Bridge re-assembly continues


Bridge re-assembly continues


Preparations begin for lifting the bridge


Preparations begin for lifting the bridge


Large crane is moved into position


Preparations continue for lifting the bridge


Preparations finalized for lifting the bridge


Preparations finalized for lifting the bridge


Preparations finalized for lifting the bridge


Crane is attached


Observers


The lift begins


The bridge leaves the ground


The bridge floats above the ground


Bridge begins to move


Bridge continues to move


Bridge is moved into final position


Bridge is set down


Finishing touches underway
(photo courtesy of Nathan Holth - Historic Bridges of Michigan and Elsewhere)


Concrete now holds the bridge in place


Stringers are complete and decking is
about to be installed


Concrete pad at bridge entrance


Stringers are complete and decking is
about to be installed


Stringers are complete and decking is
about to be installed


Stringers are complete and decking is
about to be installed


Installation of decking is under way
 


Installation of decking is under way


Installation of decking is under way


Clips hold the decking in place


Flood waters surround the bridge on
August 24, 2007


Flood waters surround the bridge on
August 24, 2007


Flood debris remains on lower bridge components on Aug. 31, 2007


Railing has been added.


Installation of decking and railings
has been completed.


Installation of decking and railings
has been completed.


Installation of decking and railings
has been completed.


Finishing touches are nearly complete.


U.S. Congressman Ralph Regula surveys the bridge prior to the dedication ceremony.


Guests gather below the awning for the dedication ceremony.


Civil War re-enactors cross the bridge prior to the dedication ceremony.  The Tusky Valley High School band waits on the far side to perform the Star Spangled Banner.


U.S. Congressman Regula speaks at the bridge dedication.


Zoarville resident Roxie Long shares her memories of the bridge.


Project manager Dave Tschantz (right) presents a plaque to Stan Rosenblatt of the U.S. Army Corps of Engineers


Dave Tschantz (right) presents a plaque to Harry Matter, President of Civil Design Associates.


Dave presents a plaque to Aldo Balestra (left), owner of Sheldon-Gantt and General Manager Bob Dermer.


Dave presents a plaque to Richard Bible, ODOT District 11 Deputy Director.


Dave presents a plaque to Tuscarawas County Commissioner Chris Abbuhl.


Dave presents a plaque to Tuscarawas County Engineer Joe Bachman.


Dave presents a plaque to David Simmons of the Ohio Historical Society.


Guests listen as Congressman Regula speaks.


Richard Bible, Bob Dermer, Aldo Balestra, Charles Lebold, Congressman Regula and Dave Tschantz (l to r) cut the ribbon to officially re-open the bridge.


Boy Scout Troop 94 of Dover crosses the bridge, followed by the Tusky Valley High School band.


Guests cross the bridge immediately following the dedication ceremony.


Guests gather on the bridge immediately following the dedication ceremony.


Guests gather on the bridge immediately following the dedication ceremony.


Congressman Regula talks with Dan Rice of the Ohio-Erie Canal Corridor Coalition.

Go to the Zoarville Station Bridge Page