Columns arrive in New Philadelphia
for re-assembly
|

Columns arrive in New Philadelphia
for re-assembly |
|

Bridge components arrive in New Philadelphia for re-assembly
|

Bridge components arrive at the
job site for re-assembly |
|

Bridge re-assembly is underway |

Bridge re-assembly is underway |
|

Bridge re-assembly continues |

Bridge re-assembly continues |
|

Bridge re-assembly continues |

Bridge re-assembly continues |
|

Preparations begin for lifting the bridge |

Preparations begin for lifting the bridge |
|

Large crane is moved into position |

Preparations continue for lifting the bridge |
|

Preparations finalized for lifting the bridge |

Preparations finalized for lifting the bridge |
|

Preparations finalized for lifting the bridge |

Crane is attached |
|

Observers |

The lift begins |
|

The bridge leaves the ground |

The bridge floats above the ground |
|

Bridge begins to move |

Bridge continues to move |
|

Bridge is moved into final position |

Bridge is set down |
|

Finishing touches underway
(photo courtesy of Nathan Holth - Historic Bridges of Michigan and
Elsewhere) |

Concrete now holds the bridge in place |
|

Stringers are complete and decking is
about to be installed |

Concrete pad at bridge entrance |
|

Stringers are complete and decking is
about to be installed |

Stringers are complete and decking is
about to be installed |
|

Stringers are complete and decking is
about to be installed |

Installation of decking is under way
|
|

Installation of decking is under way |

Installation of decking is under way |
|

Clips hold the decking in place |

Flood waters surround the bridge on
August 24, 2007 |
|

Flood waters surround the bridge on
August 24, 2007 |

Flood debris remains on lower bridge components on Aug. 31, 2007 |
|

Railing has been added. |

Installation of decking and railings
has been completed. |
|

Installation of decking and railings
has been completed. |

Installation of decking and railings
has been completed. |
|

Finishing touches are nearly complete. |

U.S. Congressman Ralph Regula surveys the bridge prior to the
dedication ceremony. |
|

Guests gather below the awning for the dedication ceremony. |

Civil War re-enactors cross the bridge prior to the dedication
ceremony. The Tusky Valley High School band waits on the far
side to perform the Star Spangled Banner. |
|

U.S. Congressman Regula speaks at the bridge dedication. |

Zoarville resident Roxie Long shares her memories of the bridge. |
|

Project manager Dave Tschantz (right) presents a plaque to Stan
Rosenblatt of the U.S. Army Corps of Engineers |

Dave Tschantz (right) presents a plaque to Harry Matter, President
of Civil Design Associates. |
|

Dave presents a plaque to Aldo Balestra (left), owner of
Sheldon-Gantt and General Manager Bob Dermer. |

Dave presents a plaque to Richard Bible, ODOT District 11 Deputy
Director. |
|

Dave presents a plaque to Tuscarawas County Commissioner Chris
Abbuhl. |

Dave presents a plaque to Tuscarawas County Engineer Joe Bachman. |
|

Dave presents a plaque to David Simmons of the Ohio Historical
Society. |

Guests listen as Congressman Regula speaks. |
|

Richard Bible, Bob Dermer, Aldo Balestra, Charles Lebold,
Congressman Regula and Dave Tschantz (l to r) cut the ribbon to
officially re-open the bridge. |

Boy Scout Troop 94 of Dover crosses the bridge, followed by the
Tusky Valley High School band. |
|

Guests cross the bridge immediately following the dedication
ceremony. |

Guests gather on the bridge immediately following the dedication
ceremony. |
|

Guests gather on the bridge immediately following the dedication
ceremony. |

Congressman Regula talks with Dan Rice of the Ohio-Erie Canal